Area
|
Check list before taking sea
|
Kitchen
|
Lock all drawers
Put dishes in cupboards
Close the dish dryer
Cover the cooker with board
|
Carré
|
Check and close all roof
windows
Secure the oil lamp
|
Bedrooms
|
Lock all doors and drawers
Close the roof window
|
Chart desk
|
Switch on “Dérive” and “Propulseur” on the
central electrical board
Switch on “Centrale navigation”, “VHF” and “HIFI”
Close all 220v
switches
|
Bathrooms
|
Lock doors and drawers
Close roof window
Drain the shower
Close toilet lid
|
Deck
|
Check that no lines are falling
in water
Remove electricity line
Remove all covers, including
roof console
Get the winch cranks
|
Instruments
|
Switch on the pilot on the stair console
Switch on the chart plotter on the helm console
Switch on the bow thruster on the helm
by pressing the two ‘on’ buttons
Check the position of the centre board on the chart plotter, and
test the centre board commands
|
Start engine
|
Press the ‘on’ button on the
Volvo panel on the helm.
Wait until the sound signal
Start the engine, thrust on low
Listen for the water getting
out through the exhaust
|
Prepare sails
|
Open the lazy bag
Remove the main sails straps
Free the jibs sheets
|
Area
|
Check list for preparing
landing
|
Sails
|
Furl the jib
Secure jib sheets
Strap main sail and close lazy bag
|
Deck
|
Remove the bowsprit
Install fenders
Prepare mooring lines, front,
middle and back
|
Instruments
|
Switch on the bow thruster on the helm
by pressing the two ‘on’ buttons
Check the position of the centre board on the chart plotter, and
test the centre board commands
|
Engine
|
Press the ‘on’ button on the
Volvo panel on the helm.
Wait until the sound signal
Start the engine, thrust on
low
Listen for the water getting
out through the exhaust
|
No comments:
Post a Comment